By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: When will 130 Million BAM worth Grebak Wind Park in Nevesinje be Built?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > When will 130 Million BAM worth Grebak Wind Park in Nevesinje be Built?
BUSINESS

When will 130 Million BAM worth Grebak Wind Park in Nevesinje be Built?

Published: December 13, 2018
Share
SHARE

The Ministry of Industry, Energy and Mining of the Republika Srpska has announced a public invitation to award a concession to build and operate the Grebak wind farm in Nevesinje, with an estimated capacity of 49.5 MW and an annual output of 130 GWh of electricity. The plant will not receive state subsidies for renewable energy sources, Balkan Green Energy News reported.

The value of the investment is estimated at BAM 130 million (EUR 65 million), and the deadline for the submission of offers is 30 days from publishing the public invitation in the Official Gazette.

The concession would be valid for a period of up to 50 years, and the obligatory condition for participation in the procedure is the deposit in the amount of BAM 650,000 (EUR 325,000).

The concession fee is BAM 0.0055 (EUR 0.0028) per kWh of electricity produced, according to the public invitation.

The wind farm will comprise 15 wind turbines and should be built at the site Grebak, about five kilometers west of the Nevesinje center.

The project envisages construction of wind turbines, a substation, control buildings, access roads, as well as a power line for connection to the transmission network.

The obligation of the concessionaire will be to resolve ownership issues at the location where the plant will be built, as well as to build access roads and facilities for the transmission of electricity from the wind farm to the connection point with the transmission network.

 

One Ukranian charged with Smuggling of Illegal Migrants in Bosnia and Herzegovina
Another Pension Increase Announced in Bosnia and Herzegovina
Tuzla Airport Expects More Than 10.000 Passengers in 2014
All Preparatory Disinfection Measures for Football Matches carried out in Zenica
The Ambassador of the United States of America met with Mayors on a Working Lunch
TAGGED:#BiH#electricity#park#windNevesinje
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Last Screening of ‘Scream for Me Sarajevo’ Tonight
Next Article Analysis: Progress regarding Respect of Human Rights in BiH
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

US Candidates for Ambassadors to BiH and Serbia are clear: Genocide happened in Srebrenica
September 17, 2026
Srebrenica Memorial Center reports the Football Association of Serbia to UEFA
September 17, 2026
Lakic and Representatives of Sarajevo Airport on New Opportunities to support the Export of Weapons Industry
September 17, 2026
Holtzapple and Bogunic on the Prosecution of the Glorification of War Crimes
September 17, 2026
Central Election Commission issues new Fines
September 17, 2026
Dodik in Israel: “We will talk to everyone except the rotten EU”
September 17, 2026
More than a Ton of Drugs worth 5 Million Euros seized in the “Bure” Operation
September 17, 2026
CEC appoints the Presidents and Deputies of the electoral Commissions
September 17, 2026
Helicopter of the Armed Forces of BiH continues to extinguish the Fire in Cvrsnica
September 17, 2026
Two injured in the Fire in the Nursing Home hospitalized in UCC Tuzla
September 17, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?