By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: When will the Section of A1 Klopce-Donja Gracanica Highway be completed?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > When will the Section of A1 Klopce-Donja Gracanica Highway be completed?
BUSINESS

When will the Section of A1 Klopce-Donja Gracanica Highway be completed?

Published July 15, 2019
Share
SHARE

The section of A1 Klopce-Donja Gracanica highway is one of the most demanding subdivisions on Corridor 5C. Its total length is 5.78 kilometers, and significant works on the section include the construction of four viaducts, two mountain tunnels and a bridge.

The parts of this section are cut by three large landslides: Talami, Ricice and Pehare. For this reason, the execution of works on the entire length of the route is done in geologically complex field conditions, which were not thoroughly processed in the main project, and there were adjustments to the highway route and the extension of the construction deadlines, was stated by Highway of Federation of BiH.

“In addition to the many problems and challenges we encountered in this section, caused by the extremely poor geological and morphological configuration of the soil, we are expecting the completion of the works until the end of the construction season of 2020. The total percentage of the contracted works at section of Klopce-Donja Gracanica is 67 percent,” said Samir Piric, engineer of JP Autoceste FBiH. One of the most demanding construction facilities on this sub-basin is the Babina river bridge, at a maximum height of 120 meters from the river level to the level of road. The final ranges are 110 meters long and the main range is 165 meters.

According to Samir Piric, joining of the right bank of Babina river is expected in mid-September.

Amira Medunjanin from BiH among Top 10 World Music Diva’s

Mountaineers from BiH and Croatia marked the Arrival of Spring with “Cimburijada”

36 Newly Infected with COVID-19 in Canton Sarajevo

Muhamed Besic went to the Netherlands?

When will the 2018 Commission’s Report on BiH be adopted?

TAGGED:#BiH#bridge#highway#tunnelsection
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article An unkown Substance spilled from ArcelorMittal Company in River Bosna
Next Article Physicists from BiH won Bronze Medal and Two Praises at Physics Olympics held in Tel Aviv
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

More than 95% of Torture Victims still have no Status and Rights
April 26, 2026
Graffiti Dedicated to War Criminal Mladic Appears on Bicycle Path
April 26, 2026
BiH FM on an official Visit to the People’s Democratic Republic of Algeria
April 26, 2026
Blockades, Lost Millions and Political Clashes stall BiH’s EU Path
April 25, 2026
MoI CS: Suspect arrested for Shooting in BiH’s Capital
April 25, 2026
Blanusa: EPRS is a Hostage of Private Interests and someone must answer for the Losses
April 25, 2026
Warning to BiH Citizens about fake Messages and Misuse of the Name IDDEEA BiH
April 25, 2026
New Steelwork Zenica will not shut down completely, reorganization will follow
April 25, 2026
The First Ukrainian Children’s Library opens in the Bosnian House in Birmingham
April 25, 2026
BiH FM on an official Visit to the People’s Democratic Republic of Algeria
April 25, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?