By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: 24 kilometers of Speed Road to go through Lasva Valley?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > 24 kilometers of Speed Road to go through Lasva Valley?
BUSINESS

24 kilometers of Speed Road to go through Lasva Valley?

Published March 31, 2016
Share
SHARE

BiH highwayPU Highways of FBiH, the Ministry of Transport and Communications and the Government of the FBiH are starting the procedure which should result in the construction of modern speed road Lasva – Nevic Polje, which is normally part of the new expanded European network of speed roads, the so called Route 2A Okucani (HR) – Banja Luka – Jajce – Travnik – Lasva, and as a very frequent traffic route, it is an excellent opportunity for the allocation of the first concessions in the field of construction of roads at the level of FBiH. Besides the conclusion of the Government that shows a commitment to the project of speed road Lasva – Nevic Polje, certain preparatory activities have already been completed. The main project has been prepared and revised in May 2013.

The above mentioned section with facilities and infrastructure is divided into three sub-sections, Lasva – Kaonik that is 5.356 kilometers long, Kaonik – Vitez that is 8.175 kilometers long and Vitez – Nevic field that is 10.854 kilometers long, which makes total of 24.385 kilometers of speed roads. Speed road Lasva – Nevic Polje is quite challenging because it needs 4 loops, 18 bridges, 3 tunnels, 4 payment centers and a rest area.

Estimated value of the project amounts to 217 million EUR. In order for the concession project of that section to be approved, it is necessary to make the study of economic justifiability and after its approval, to create tender documents.

PU Highways of FBiH submitted the request for urban permit for the construction of the speed road Lasva – Nevic Polje, but the process of issuance of the Ministry of Physical Planning was stopped until the end of process of harmonization of the spatial plan of Central Bosnia Canton with the draft of spatial plan of the FBiH. The route of the projected section of the road is fully harmonized with the requirements of the local communities, the draft of spatial plan of FBiH and the first draft of spatial plan with specific characteristics of importance for the FBiH “Corridor 5C Highway”, but it is not in agreement with the spatial plan of the CBC.

The presentation of the project of construction of the speed road Lasva – Nevic Polje to potential investors and publication of a public call for expressions of interest will follow after getting the “green light” from the Government of FBiH. Then, an external consultant will be engaged to prepare study of economic justifiability, propose concession model and prepare documents.

(Source: akta.ba)

BiH Banks’ ability to maintain the availability and quality of Services are not compromised

Bosanska Krupa: Organic Production and Medicinal Herbs Fair Held

BiH’s Industry is growing on the Back of Mines, the Problem is Textile Production

What will happen with Workers of the Ginex Company in BiH?

Total Seasonally Adjusted Industrial Production in Bosnia and Herzegovina recorded Decrease

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Vojislav Seselj acquitted of War Crimes!
Next Article Should we expect the Division of Mostar soon?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

The BiH Council of Ministers is considering the Decision to adopt the BiH Reform Program
February 9, 2026
CEC BiH: Karan won almost 11,000 more Votes than Blanusa
February 9, 2026
IGK Reaction to Dodik’s scandalous Interview in Washington
February 9, 2026
BiH Presidency Member: We will win in October too
February 9, 2026
Ermin Sijamija appointed as the new Acting Director of the Sarajevo National Theater
February 9, 2026
Blanusa admitted Defeat: I am not disappointed, we worked honorably and honestly
February 9, 2026
SNSD declares Karan’s Victory for President of Republika Srpska
February 8, 2026
BiH Delegation at the Opening of the Global Military Exhibition in Riyadh
February 8, 2026
Observers noted more severe Forms of Election irregularities
February 8, 2026
High Turnout in repeat Elections in Republika Srpska
February 8, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?