By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Bjelasnica In The Final Phase Of Preparations: Everything Ready For The Opening Of The Winter Season
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BH TOURISM > Bjelasnica In The Final Phase Of Preparations: Everything Ready For The Opening Of The Winter Season
BH TOURISM

Bjelasnica In The Final Phase Of Preparations: Everything Ready For The Opening Of The Winter Season

Published November 23, 2025
Share
SHARE

The Olympic Center Bjelasnica-Igman is entering the final phase of preparations for the opening of the 2025/2026 winter season.

In the past weeks, work was intensively carried out on arranging the ski slopes, checking the snowmaking system, and servicing the lifts, and the situation on the ground confirms that the ski resort will be ready in the shortest possible time.

From the Olympic Center, they point out that all activities have been carried out according to plan, with emphasis on user safety, the stability of the surface, and the full functionality of technical systems.

“All cable cars and ski lifts have been serviced on time and technically inspected in accordance with regulations and internal safety procedures. Protective nets, pads, visual markings, and complete signage have been installed on the routes, as well as equipment for the safe entry, exit, and movement of users,” they state from Olympic Center Bjelasnica.

At the Olympic Center headquarters, they emphasize that the arrangement of the ski slopes has been carried out at full capacity: the slopes have been mowed, cleaned, and prepared so that better snow stability is ensured and melting is reduced during warmer intervals.

Currently, about 40 cm of natural snow that has fallen on the mountain is being treated, and machines are working on forming a compact base for the season.

From the Olympic Center, they also announced that the entire snowmaking system has been tested and is fully ready for operation, including pumps, water lines, snow guns, and automatic control. They announce that in the coming days, technical snow will be produced, especially in shaded sectors, in order to secure reserves for the final arrangement of the slopes.

Speaking about the weather conditions, they emphasize that no significant impact is expected from the announced precipitation and southern wind from November 27th to 29th, because, as they say, the surface has already been reinforced and cooled by machine processing. After the announced cooling from November 29th, the finalization of all works is planned, after which the ski resort will be ready to start operating.

“About 70 employees of the Ski Center are participating in the preparations, distributed across the sectors of slopes, transport, snowmaking, machines, safety, and operations. All teams are working intensively so that the conditions for the opening of the season are met at the highest level. We are entering the final phase of preparations, with the goal of opening the ski resort safely, with quality, and in accordance with the best standards of the ski industry,” they state from Olympic Center Bjelasnica-Igman.

They add that the official opening date of the season will be announced in due time, Klix.ba writes.

 

 

Pearl of Herzegovina again among the Hottest Cities in Europe

BiH more and more interesting to foreign Tourists

Kljuc invests 500,000 BAM in Infrastructure and Tourism

The huge Cruiser “Bolette” anchored in Neum with more than a thousand Passengers

Construction of the Complex “Tarčin Forest Resort” (gallery)

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article G20 Leaders adopt Declaration on Climate Change Crisis
Next Article Dodik met with Vucic, Saying That They ‘Stand Shoulder To Shoulder’
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Electricity Production in BiH in 2025 at last Year’s Level
December 29, 2025
“No Child without a Present” – Five Thousand Packages for Children in BiH
December 29, 2025
“Winter on Trebevic Mountain” Brings Festive Atmosphere to Sarajevo’s Olympic Beauty
December 29, 2025
Important Issues on the Agenda at Today’s Council of Ministers of BiH Sessio
December 29, 2025
Rutte: Only Trump Can Force Putin To Make Peace
December 29, 2025
New Schengen Rules: The Balkan is threatened with a complete Collapse of Supply Chains
December 28, 2025
Branko Blanusa elected President of SDS
December 28, 2025
“New Year’s and Christmas Bazaar” solemnly opened in Trebinje
December 28, 2025
PM Niksic: The Results Of This Government Are Clearly Visible
December 28, 2025
Schumacher Tops the List as the Wealthiest Formula 1 Driver Ever
December 28, 2025
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?