By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Disposal of Agricultural Waste is one of the Major Challenges in BiH (video)
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Disposal of Agricultural Waste is one of the Major Challenges in BiH (video)
BUSINESS

Disposal of Agricultural Waste is one of the Major Challenges in BiH (video)

Published June 12, 2019
Share
SHARE

Disposal of agricultural waste is one of the major challenges in Bosnia and Herzegovina (B&H). This includes the fertilizer / manure from the animal handling facilities, and waste generated during slaughter and meat processing. Disposal of such materials poses a major environmental problem, as well as a health risk for the community. Biogas power plants can be a solution because they convert this waste into electrical, heat and fertilizer.

Investments in biogas plants are encouraged through guaranteed purchase of electricity at a feed-in tariff that is significantly higher than the market price. Subsidized purchase of electricity from power plants on biogas gives farmers an incentive to properly handle and dispose of waste, thus protecting water, soil and air from pollution. The guaranteed revenue from the sale of electricity will help farmers during market fluctuations, which will preserve existing jobs and create conditions for new ones.

The video that the USAID EIA prepared and will be displayed on the stand at the ENERGA 2019 Fair:

The quantities of electricity that will be purchased at the incremental purchase price (quotas) are defined in the entity action plans for the use of renewable energy for the period 2014-2020. In November 2018, the Action Plan of the Federation of Bosnia and Herzegovina (FB&H) changed and introduced a planned purchase of 9.6 GWh of electricity from power plants to biogas in 2020, which corresponds to the production of a power plant of 1.2 MW.

By November 2018, the main obstacle to the construction of biogas plants in the FBiH was the lack of quotas for biogas plants, which exist for other power plants using renewable sources. USAID’s Investing in Energy Sector (EIA) project has made significant efforts to show the competent institutions the importance of subsidizing biogas plants and provide technical assistance in amending the FB&H Action Plan to include the biogas power plant quota.

Since June 2015, the USAID EIA project and the Spreca farm cooperate on technical issues related to the design and operation of the biogas plant, as well as the identification and removal of obstacles in the process of obtaining licenses. Construction of a 600 kW power plant at the Spreča farm, Kalesija began. To power a 600 kW power plant, manure of about 4,000 cows or 600,000 chicken or 80,000 pigs, which is an opportunity for a greater number of livestock breeders to provide enough quantity of manure and to obtain financing. In FB&H guaranteed purchase prices are very stimulating also for power plants of 150 kW and the return on investment is significantly shorter than 12 years of the duration of the contract for electricity purchase.

In Republika Srpska (RS), in 2020, the purchase of 13.48 GWh of electricity from power plants on biogas is planned, which corresponds to the production of a 1.7 MW power plant. The RS has already built a 1 MW biogas power plant within the company GOLD-MG, Donji Žabar, near Brčko. In RS, guaranteed purchase prices are favorable for installations larger than 500 kW, which indicates an even greater need for farmers’ association.

And after 2020, biogas plants will be encouraged and an Action Plan for the period 2020-2030 is currently being prepared.

Sarajevo Mayor disappointed with Stanivukovic’s position on Inzko’s Law

Scandalous Video of the United Srpska caused Criticism on Social Networks

Bauhaus to Open in Sarajevo

President Nikolic’s Visit questionable because of the possible lawsuit against Serbia?

Chinese to invest in a Power Plant in Gacko, works could begin as early as next Year?

TAGGED:#agricultural#agriculture#BiH#disposal#fertilizer#local#news#products#solutionBosnia
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article SIPA arrested Persons for smuggling Fourteen Illegal Migrants
Next Article Take a Look at the 1.1 Million worth new Facility on Trebevic Mountain (video)
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

One Person killed in Tram Accident in Sarajevo
February 12, 2026
Peskov: New Round of Talks on Ukraine soon
February 12, 2026
BiH Central Election Commission fines Three Political Parties
February 12, 2026
Trial for Crimes in the Zvornik Area postponed due to the Accused’s Health Condition
February 12, 2026
EUFOR Commander Major General Maurizio Fronda visits Tuzla
February 12, 2026
Sarajevo hosts the Presentation of the First Humanoid Robot in BiH
February 12, 2026
The Strike grounded Hundreds of Lufthansa Planes
February 12, 2026
Forto and Uraloğlu Meet in Istanbul: Direct Sarajevo – Ankara Flight Expected Soon
February 12, 2026
Production in Lukavac Koksara is being shut down
February 12, 2026
Second Base Aircraft and New Routes Soon to Arrive at Tuzla Airport
February 12, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?