By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: New Project: Building of Green Spaces Instead of the Marketplace in Sarajevo
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > New Project: Building of Green Spaces Instead of the Marketplace in Sarajevo
OTHER NEWS

New Project: Building of Green Spaces Instead of the Marketplace in Sarajevo

Published: February 15, 2015
Share
SHARE

Projekat 2In the center of Sarajevo, where the current marketplace Sirano is situated, a new development may soon be built. The structure would include green areas on each floor and on the roof.

Recently, in the premises of the Sarajevo Municipality Center, a public hearing on the issues of the project “Quadrant Sirano-The site of Sirano” was held. In general, the main problem which was addressed is that of the demolition of buildings located on the site of the market Sirano and the construction of a new commercial and residential space with an underground public garage.

Projekat BiHThis unique building project in BiH has been designed by the Bosnian architect Adnan Omerović. The building will have a total of seven levels and two underground garages.

On the second floor, there will be a floating green garden and on the top there will be a green garden and a viewing point. In the area around the building fountains and green spaces are planned to be built as well.

“The green areas will function for all citizens, and will be designed as a city park. A space for children, as well as a special section for recreational activities are planned as well. The total building area is 12.000 square meters. In the basement there will be a planned space for the market Sirano. Two levels will be built as the business section, while the other levels will be residential” the Exclusive company announced.
The building could be built in a year and a half.

 

(Source: Klix)

30 Million USD for Construction of South Wing of Clinical Center in Banja Luka
How many Percent of the Territory in B&H needs to be demined?
The Sarajevo Government and Police: We will raise Traffic Safety to a higher Level
Brutal Double Murder in Sarajevo Shocks Public
Foreign Media recalled: Bosko and Admira, Love Heroes of besieged Sarajevo (Video)
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Made in BiH on the Shelves of the Biggest Mall in the World
Next Article Džanan Musa invited to play for the Jordan Brand Camp
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

AfD Seeks Answers from the German Government: Who Is Blocking the Agreements with BiH on War Graves 
October 25, 2026
Sarajevo defeats Zeljeznicar in the 161st Eternal Derby on its 80th Birthday
October 25, 2026
Central Election Commission determinates the Results of the 2026 General Election
October 25, 2026
EU Supports Young Journalists in BiH: Workshop on Reporting EU Stories Held in Banja Luka
October 25, 2026
Ryanair plans new Sarajevo Routes as Fresh Airline Subsidy Tender opens
October 25, 2026
The U.S. Embassy conducts a Security Exercise with Police, Firefighters, and Emergency Medical Services
October 25, 2026
The 25th Prayer Day for the Homeland marked in Bobovac
October 24, 2026
Becirovic and Magyar discuss the Enhancement of Relations, Investments and European Integration
October 24, 2026
The Largest Military Exercise in BiH: 1,200 Soldiers and High NATO Ratings
October 24, 2026
Slovenian Contingent Holds Change of Command Ceremony at Camp Butmir
October 24, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?