By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Numerous Advantages of the Construction of Block 7 of TPP Tuzla
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Numerous Advantages of the Construction of Block 7 of TPP Tuzla
BUSINESS

Numerous Advantages of the Construction of Block 7 of TPP Tuzla

Published: August 22, 2018
Share
SHARE

There is a consensus that the construction of the Block 7 of Thermal Power Plant Tuzla is necessary for the stability of the power system in BiH, and the works should begin in the month of September this year.

The Prime Minister of the FBiH, Fadil Novalic, said that there are numerous advantages of the construction of this block, and they include ecological advantages, savings of coal and new workplaces.

According to the prime minister, the power plant system that we have now is unsustainable because they are around 40 years old.

Besides the ecological aspect, there are also savings because less than a third of the coal is consumed for the same amount of electricity, which results in the survival of the economy.

“The economy that is very important in the Canton Tuzla – the economy of coal and electricity, will survive, although it has been labelled as undesirable, but we cannot be without it. Thermal power plants are being constructed in Germany, Poland, Greece, and even in Sweden,” stated Novalic.

According to Prime Minister Novalic, Tuzla or Canton Tuzla could have the new thermal block in around five years.

(Source: biznisinfo.ba)

Forum for Prosperity and Jobs follow up Seminar in Banja Luka
Works on the Construction of the State Prison progressing with a planned Pace
BiH a moderately indebted Country, Neighbors swimming in Debts!
Sixty Products with Locked Prices in the Federation of BiH
“Sarajevo Car Show – SIA 2023” starts soon
TAGGED:#construction#projectadvantagesBlock 7Fadil NovalicTPP Tuzla
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Croatian President congratulated Birthday to a Bosnian Girl in a Letter
Next Article Minister of Foreign Affairs of Russia to visit BiH
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

EFJ: Prevent the Shutdown of BHRT, urgent European Action needed
September 22, 2026
EUFOR Commander Meets Egyptian Ambassador to Strengthen Partnership in Support of BiH’s Stability
September 22, 2026
“Pantera” Police Action against Drug Trafficking is ongoing
September 22, 2026
BiH Presidency Member submits Report to SIPA against Foreign Minister
September 22, 2026
“Future is the EU” – Young People call for more Opportunities to learn, work and build their Future
September 22, 2026
Sarajevo to host the Regional Ministerial Meeting organized by Transport Community
September 22, 2026
“Sarajevo’s Problem is not Scooters, but 40,000 Motor Vehicles”
September 22, 2026
Race for the Cure in Sarajevo: A Run and Walk for Life, Health, and Solidarity
September 22, 2026
Demographic Policy has made Siroki Brijeg a desirable Place to live
September 22, 2026
BiH National Team Begins Nations League Preparations with Training at Grbavica Stadium
September 22, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?