By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Terrain for the Construction of Wind Farm Hrgud is being prepared
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Terrain for the Construction of Wind Farm Hrgud is being prepared
BUSINESS

Terrain for the Construction of Wind Farm Hrgud is being prepared

Published: February 2, 2018
Share
SHARE

Elektroprivreda of the RS (ERS) announced an international public call for the procurement of consulting services within the project of Wind Farm Hrgud.

The ERS concluded a concession contract with the Ministry of Industry, Energy and Mining of the RS with the aim to realize this project, according to which the planned period of time needed for the construction of a wind farm is three years, of which two years is needed for preparatory activities, and a year for the actual construction.

The main aim of this program is to increase the share of renewable energy in BH energy system and improve the economic situation in the region. The feasibility study for the Wind Farm Hrgud (WF Hrgud) was created for this purpose.

The total planned costs of the WF Hrgud were estimated at 65 million EUR.

The Government of the Federal Republic of Germany provided a grant in the total amount of 200,000 EUR for cofinancing of ESIA, including optional services.

To recall, the realization of project “Hrgud” in the RS includes the construction of a wind farm with installed capacity of 48 megawatts, and the estimated net annual production is 126 GWh of electricity, and the area of Hrgud is located at the altitude between 960 and 1,100 meters and occupies an area of about 5 square kilometers.

The construction of the wind farm “Hrgud” represents an obligations from the Action Plan for the Construction of Renewable Energy Sources by 2020, which was adopted by the Government of the RS.

(Source: akta.ba)

 

BiH interested in alternative Gas Sources
FHMZ issues Orange Alert for strong Winds, intense Rainfall
EU supports BiH in managing Migration Flows with additional 13 million Euros
Business in Argeta Meets EU Standards
1,516 Persons Coronavirus Positive in Bosnia and Herzegovina
TAGGED:#BiH#elektroprivredaRS#projectthe RSwind farm Hrgud
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article The total Debt of the FBiH Government decreased, and now amounts to about 5.6 Billion BAM
Next Article What is the exact Amount of Money invested in BiH in 2017?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

Thousands Back Growing Campaign to Return the NUL to Sarajevo City Hall
June 16, 2026
Fans and Players Together Thanks to Barbarez: More Than 1,000 Spectators Follow BiH Training Session
June 16, 2026
More Packaging in Sarajevo Canton ends up in recycling and not in the Landfill
June 16, 2026
Kristo visits the Central State Office for Croats Abroad
June 16, 2026
EUFOR and University Clinical Centre Sarajevo Discuss Enhanced Cooperation
June 16, 2026
Calgary Declares July 11, 2026 as Day of Remembrance for Victims of the Srebrenica Genocide
June 16, 2026
The Government of RS is planning a new Debt of 800 Million BAM
June 16, 2026
The Government of the Federation of Bosnia and Herzegovina Determines the Maximum Margin Level
June 16, 2026
EU Calls on BiH to Strengthen Rule of Law and Advance Key Reforms on the Path to EU Membership
June 15, 2026
High-level OSCE conference to address current security challenges across the OSCE area
June 15, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?