By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The Construction of the most expensive Section of Corridor Vc is officially underway
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The Construction of the most expensive Section of Corridor Vc is officially underway
BUSINESS

The Construction of the most expensive Section of Corridor Vc is officially underway

Published: April 9, 2023
Share
SHARE

In Zepce, a meeting of representatives of the Municipality, investors, and beneficiaries of the expropriation of Motorways of the Federation of Bosnia and Herzegovina (FBiH) was held on Thursday, as well as the contractor Cengiz Insaat As and the supervision of Yuksel Proje AS – Trasa d.o.o. Joint Venture.

The meeting was held with the aim of handing over and marking out properties that were completely expropriated for the purpose of building the highway on Corridor Vc, section Medakovo – Ozimica.

The properties in question are located in the territory of the municipality of Zepce, Ljubatovici, Goljesnica, and Ozimica.

With this introduction into property ownership, the works on the construction of the highway on the Corridor Vc route, the Medakovo-Ozimica section with a total length of 21.5 kilometers, officially begin.

This section will be built in the area of three municipalities – Zepce, Maglaj, and Tesanj. The deadline for carrying out the work is 30 months.

It should be recalled that the contract worth as much as 361.7 million euros, that is, over 700 million BAM, was signed in March. This is the price without VAT, and if this tax were included, the value of the section exceeds 800 million BAM.

This makes this section currently the most expensive on Corridor Vc, Biznis Info reports.

E.Dz.

Member of BiH Presidency: We must not ignore the Challenges Women still face in this modern World
Investors from Saudi Arabia, Norway and Italy Will Attend Seed Forum
Death toll from wildfire near Athens reaches 50
The Relationship between Supply and Demand for Money in FBiH remains stable
Starbucks Market Value reduced by almost 11 Billion Dollars since the Beginning of the War in Gaza
TAGGED:#bosnia#highway#news
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Dodik: With every Announcement, the U.S. Embassy destroys the Reputation of its Country
Next Article Dodik: I am trying to convince Croats to leave the BiH Institutions once and for all
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

34th Anniversary of the Suffering of Serbian Civilians marked in Bradina
May 25, 2026
BiH National Team ready for the World Cup: We are not afraid of anyone
May 25, 2026
Sarajevo gets more Flights: Eurowings increases Capacity
May 25, 2026
Commemoration of the 31st Anniversary of the War Crime at the Tuzla Gate
May 25, 2026
COM EUFOR Visits Kosovo to Strengthen Regional Cooperation and Security Dialogue
May 25, 2026
Sarajevo Airport and Irish Ambassador Discuss Stronger Sarajevo–Dublin Connectivity
May 25, 2026
Et Tu, Brute? Bakir Izetbegovic…
May 25, 2026
Hunger Strike postponed in Zenica Mine
May 25, 2026
Dodik: After 30 Years, the High Representative Position Should Be Abolished
May 25, 2026
Armed Forces of BiH Helicopter Completes Difficult Recovery Mission on Cvrsnica
May 25, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?