By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: UNDP: the Completion of Phase 1 Infrastructure Upgrades
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > OUR FINDINGS > OTHER NEWS > UNDP: the Completion of Phase 1 Infrastructure Upgrades
OTHER NEWS

UNDP: the Completion of Phase 1 Infrastructure Upgrades

Published February 2, 2015
Share
SHARE

undpThe end of January marks the completion of Phase 1 infrastructure upgrades aimed at improving safety conditions at four designated military storage facilities located in Krupa, Kula, Rabić, and Teufik Buza.

In Krupa, structures were outfitted with new windows and roofing, while walls and ceilings received structural reinforcement. Where necessary, buildings received new facades in order to improve insulation. Further, in an effort to maximize climate conditions within storage facilities, drainage and ventilation systems were completely reconstructed.

Similarly, all Zone 1 facilities in Kula were equipped with new ventilation systems, featuring new concrete casings for exterior ventilation ducts. Additionally, the frontal reinforced concrete walls of all storage facilities were reconstructed in order to boost structural integrity. In Zone 2, the construction of access ramps and reconstruction of the gravel road will improve overall accessibility. Zone 2 further received a new water pumping station.

Meanwhile in Rabić, various administrative and guard facilities, in addition to a weapons storage facility, were reconstructed with upgrades to the facilities’ safety features.

In Teufik Buza, improvements featured the construction of a new heating system for administrative and guard facilities, which included the reconstruction of the boiler room intended to improve the occupational safety of the guards. The primary drainage system near the weapons storage and guard facilities was also reconstructed. Certain storage facilities were supplied with new electrical installations, such as fuse boxes.

With an estimated cost of  780,000 BAM, these upgrades serve as a major contribution in the ongoing efforts to prevent uncontrolled and accidental explosions at storage sites. Structural improvements further serve as a safety measure by decreasing the opportunity for ammunition and SALW deterioration that leads to explosion. As Phase 1 activities, which began in September of 2014, draw to a close, preparations for Phase 2 are underway. Set to launch in March and last until September 2015, the second round of infrastructure upgrades will expand upon Phase 1 enhancements with a projected budget of BAM 1,000,000. Funds for both Phase 1 and Phase 2 upgrades were provided by the European Union.

by Tracy Trachsler

(Source: UNDP)

Non-working days for Easter in Republika Srpska

A Playground for Children with Disabilities Opened in Zenica

IDDEEA answers on the Speculations about the Passports

Between past Horrors and a bright Future: a new Sarajevo

A Resident of Sarajevo has 280 thousand BAM of unpaid Fines

Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Tauber: this was something I needed to do. This is something that Bosnians need to hear about
Next Article Where the grant from the Government of Japan be allocated to?
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Sarajevo Cable Car resumes Service
April 19, 2026
Fuel never more expensive, House of Peoples to discuss Excise Taxes Tomorrow
April 19, 2026
EUFOR and Armed Forces BiH will Train Together in Manjaca
April 19, 2026
Prevot after Visiting Srebrenica: “I cannot stress enough how important it is to reject the Denial of War Crimes”
April 19, 2026
Mihael Stajnar is the Winner of the Tour of Bosnia and Herzegovina
April 19, 2026
EUFOR Commander hosts Belgian Foreign Minister in Camp Butmir
April 19, 2026
BiH Foreign Minister meets with OSCE Secretary General
April 19, 2026
Message of Coexistence Marking 102nd HVO Brigade Anniversary with Joint Prayers by Priest and Imam
April 19, 2026
Embassy of BiH in China presents the European Youth Cultural Festival in Beijing
April 19, 2026
Residents of Jezero appeal to the Authorities against Geological Research
April 19, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?