By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Where are Highways being built in BiH: They will reduce the Distance between Cities
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Where are Highways being built in BiH: They will reduce the Distance between Cities
BUSINESS

Where are Highways being built in BiH: They will reduce the Distance between Cities

Published July 31, 2023
Share
SHARE

”Since Corridor 5C does not pass through all parts of the country, the commitment of the Government of the Federation of Bosnia and Herzegovina (FBiH) and Public Utility Autoceste(Motorways) of FBiH is to build highways throughout the Federation in order to enable the even infrastructural development of all cantons, and to make them even more attractive to attract both domestic and foreign investments, ” it was said from Motorways of FBiH.

Financing of expressways in FBiH is done from the Budget of the FBiH. Every year, the FBiH Government adopts the Decision on the adoption of the program for spending part of the funds “Capital transfers to public companies – transfer for the construction of highways and express roads“, determined by the FBiH Budget.

The funds are intended for financing the costs of design, expropriation, works and supervision.

Express roads in the FBiH are:

Bihac – Cazin – Velika Kladusa – Border with the Republic of Croatia;

Bihac – Kljuc;

Lasva – Travnik – Jajce;

Praca – Gorazde;

Mostar – Siroki Brijeg – border with the Republic of Croatia.

Contracts for the execution of works were signed for the Praca – Gorazde (Hranjen Tunnel) and Lasva – Travnik – Jajce expressways, the Lasva – Nevic Polje section (LOT 5 exit from the Vitez – Nevic Polje business zone), and the last section of the Sarajevo bypass from Vlakovo to Mostar intersection – LOT 3B.

Other sections are in the phase of preparation for construction.

Hranjen tunnel

More than 50% of the main and service tunnel pipes have been breached

The Hranjen tunnel with a total length of 5.5 kilometers, which is under construction, is an integral part of the 18.5 kilometer long Praca – Gorazde expressway project (Hrenovica – Hranjen – Gorazde), which will connect Sarajevo and Gorazde. The construction of the Hranjen tunnel represents a historic project for Gorazde, as the road distance between this city on the Drina and Sarajevo will be reduced from the current 95.6 to 56 kilometers.

The contractor is Euro-asfalt d.o.o. Sarajevo, and the supervision of the works is carried out by IPSA Institute d.o.o. Sarajevo.

Lasva – Nevic Polje, LOT 5

Express road through central Bosnia

In the area of the Central Bosnian Canton, the construction of one part of the section of the expressway Lasva – Nevic Polje, LOT 5, with a length of 4.8 kilometers, is underway. The other four LOTs of this section are Lasva – Kaonik, Kaonik – Seliste, Seliste Vitez (Vitez interchange – entrance to the business zone), and Poslovna zona Vitez (Vitez interchange – from the entrance to the exit of the Business Zone). The future road Lasva – NevicPolje will have a total length of 24.3 kilometers.

LOT 5 is designed as a road with the characteristics of an expressway with two traffic lanes (driving and overtaking) for each direction of movement.

Sarajevo bypass – LOT 3B

Activities undertaken with the aim of continuing and completing construction

The route of the expressway LOT 3B is the connection of the Vlakovo interchange with the interchange at the Mostar intersection to the main road M-17/M-5, with a total length of 1.44 kilometers.

The construction of LOT 3B will enable a better traffic connection of the highway on Corridor Vc with the network of lower-level roads, main and local roads. More specifically, a direct connection will be provided for vehicles coming towards the Vlakovo interchange on the highway from the roundabout at the Mostar intersection, i.e. from the direction of Kiseljak, Rakovica, Pazaric and Hadzici, Biznis Info reports.

E.Dz.

RS Government grants China’s Shandong International 33 Years Concession on Highway

Biggest Investment in Financial Sector in B&H in 2013-BBI Bank Is Increasing Capital by 30 Million KM

The Totally Seasonally Adjusted Industrial Turnover in BiH increased

More than 20 million Doses of the AstraZeneca Vaccine have been administered in Europe

How much do the Yachts owned by Bosnians and Herzegovinians cost?

TAGGED:#bosnia#highway#new#news
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Who allowed the Arrival of the Cruise Ship in Neum?
Next Article Miners from all over Bosnia and Herzegovina to protest in Sarajevo
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Forto-Soreca: EU steps up Efforts to find Solutions for Professional Drivers
February 2, 2026
‘City Museums’ Sarajevo implemented the First Phase of the Bosnian Open-Air Museum Project
February 2, 2026
Medical Experts say Dudakovic is not fit to stand Trial due to Illness
February 2, 2026
BiH Presidency Member meets with Ambassadors of Quinte Member States
February 2, 2026
SIA Representatives participated in Airport AI Exchange in Dubai
February 2, 2026
Social Map as the Foundation for Fairer Policies: Law Sent to the FBiH Government
February 2, 2026
Increased Number of blocked Accounts of Business Entities in BiH
February 2, 2026
Only Seven of 251 Pre-Election Promises Fulfilled in Three Years of Council of Ministers’ Mandate
February 2, 2026
Chairman of BiH Presidency meets the Chargé d’Affaires of the U.S. Embassy in BiH
February 2, 2026
An Earthquake recorded in Western Herzegovina
February 2, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?