By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Contracts for the Construction of Three Major Infrastructure Projects signed?
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > Contracts for the Construction of Three Major Infrastructure Projects signed?
BUSINESS

Contracts for the Construction of Three Major Infrastructure Projects signed?

Published August 22, 2016
Share
SHARE

projectsMayor of the Municipality of Novi Grad Sarajevo, Semir Efendic, signed the contracts for the construction of the separate drainage networks in the settlements Svrakino Selo and Aneks.

There are three major infrastructure projects with whose realization will be resolved long-standing problem of the citizens of these two local communities.

In Svrakino Selo will be built separate sewerage network in a length of 330 meters in Kodzina Street and Vejsila Curcica Street and in a length of 156 meters in Atifa Karalica-cikma Street.

Drainage network in a length of 564 meters will be done in Prnjavorska Street on Aneks, where the Municipality of Novi Grad made new fecal sewage system two years ago, which is associated with the construction of a school building on Aneks.

Now will be built another part of the network, which is a precondition for paving of this streets.

Director of the company “Bujice” Ahmed Boloban, which will work on the sewage network at Atifa Karalica-cikma Street, said that the company realized several projects in the area of Novi Grad, noting that this will also be done in a quality manner and according to the schedule.

A total of 468 000 BAM was allocated for those projects from the budget of the Municipality Novi Grad, as announced from this municipality.

(Source: akta.ba)

Agreement for the Management of BiH Agricultural Sector to be Signed Today

Launch of Project “Credo Krajina”, 250 New Jobs

ZEPS Intermetal to gather Exhibitors from around the World this Year as well

BiH has banned the Import of Mandarins from Croatia

Implement Reforms To Improve Living Standards

TAGGED:#contracts#infrastructure#projects#sarajevoNovi Grad
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Which Lieutenant in the AFBiH replaced a Leather Jacket and Guitar with the Uniform?
Next Article Team for Maintenance of Playgrounds in the Sarajevo Canton formed
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2kFollowersLike
10.1kFollowersFollow
414FollowersFollow

Latest News

Interview with the Ambassador of BiH to the United Nations Zlatko Lagumdzija
April 30, 2026
HR Schmidt: BiH should take Advantage of changing Circumstances in Europe to advance its European Path
April 30, 2026
Sniper Alley Searches for a Photographer Who Captured a Boy During the Siege of Sarajevo
April 30, 2026
BiH Minister of Defense meets the Ambassador of the Kingdom of Spain to BiH
April 30, 2026
The Central Bank of BiH pays 184 Million BAM in Profit in BiH Budget
April 30, 2026
“The Court’s Decision to release Kunarac is a Slap in the Face to all Victims of War Crimes”
April 30, 2026
Discover the Forgotten Gates of Sarajevo: Secrets and the Influence of Austro-Hungarian Architecture
April 30, 2026
American Production Company to Chronicle BiH’s Historic Road to the World Cup
April 30, 2026
Sad Anniversary: Graham Bamford burnt himself alive because of the Killing in BiH
April 30, 2026
Stanisic Seeks Early Release After Serving Two-Thirds of Sentence
April 30, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
adbanner
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?