By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Sarajevo TimesSarajevo TimesSarajevo Times
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Search
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: The largest Wind Farm in BiH begins trial Operations
Share
Font ResizerAa
Sarajevo TimesSarajevo Times
Font ResizerAa
  • HOME
  • POLITICS
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
  • SPORT
  • ARTS
  • W&N
Search
  • HOME
  • POLITICS
    • BH & EU
  • BUSINESS
  • BH TOURISM
  • INTERVIEWS
    • BH & EU
    • BUSINESS
    • ARTS
  • SPORT
  • ARTS
    • CULTURE
    • ENTERTAINMENT
  • W&N
Follow US
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
© 2012 Sarajevo Times. All rights reserved.
Sarajevo Times > Blog > BUSINESS > The largest Wind Farm in BiH begins trial Operations
BUSINESS

The largest Wind Farm in BiH begins trial Operations

Published: January 22, 2025
Share
SHARE

The wind farm has an installed capacity of 84 MW and consists of 20 wind turbines, each with a capacity of 4.2 MW.

The Prime Minister of Canton 10, Ivan Vukadin, held a meeting two days ago with representatives of the company VE Ivovik.

VE Ivovik director Wang Zhiqiang, Cao Qi, head of legal and commercial affairs, and the company’s lawyer Kemal Svrakic informed Vukadin about the activities completed so far to ensure the Ivovik wind farm starts operating as soon as possible.

Despite numerous challenges, including difficult terrain and rising material costs, the project has entered its final phase and will soon make a significant contribution to the country’s renewable energy supply. After obtaining the operational permit, the first turbines began producing electricity.

Trial operations are underway, marking a key step in the commissioning process of the wind farm.

During the trial phase, each turbine will undergo a gradual commissioning process with detailed performance evaluations to ensure the Ivovik wind farm is fully integrated into the national energy system.

Representatives of VE Ivovik thanked Vukadin and the government for their excellent cooperation so far.

Vukadin stated that every project aimed at contributing to the development of the canton has the government’s support.

“Up until now, we have always been available to all investors for any project. Every investment is welcome, especially when it involves one of the largest projects in Bosnia and Herzegovina (BiH) in the field of renewable energy,” emphasized Vukadin.

The Ivovik wind farm has an installed capacity of 84 MW, consisting of 20 wind turbines, each with a capacity of 4.2 MW, and it will be the largest wind farm in BiH.

Bosnia and Herzegovina benefits from further Allied Assistance against global pandemic
Cybercrime is gaining Momentum in Bosnia and Herzegovina
FBiH indebts for an additional 20 Million BAM?
American Magazine “Techflier” made a List of 13 Startups from BiH to know about in 2017
Funds provided for the Construction of Cazin Bypass
Share This Article
Facebook Whatsapp Whatsapp Telegram Threads Bluesky Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article New rotation of Aviation Detachment, unchanged dedication!
Next Article Czech President Petr Pavel is paying an Official Visit to BiH
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

10.2KFollowersLike
10.1KFollowersFollow
414FollowersFollow

Latest News

RS Constitutional Court: Bosniak Club’s Request for a Declaration on the Closure of the OHR is unacceptable
June 17, 2026
“I want the Euphoria around Dragons to last, it will be easier for us to play Switzerland”
June 17, 2026
Interview with Zvizdic: BiH cannot Progress on the European Path while SNSD is an important Political Factor
June 17, 2026
The National Assembly of Republika Srpska concluded its Special Session
June 17, 2026
The Football Team of BiH is leaving the Base in Salt Lake City
June 17, 2026
Dynamic Response 26-6: COM EUFOR Watches AF BiH Demonstrate Its Readiness
June 17, 2026
Rutte: The US is not withdrawing from Europe by announcing a Reduction in NATO Funding
June 17, 2026
Is the European Path or the European Halt?
June 17, 2026
Central Bank of BiH Unveils Commemorative Medallion Honoring the Nation’s World Cup Legacy
June 17, 2026
Three Persons arrested over Unauthorised Drug Production
June 17, 2026
Sarajevo TimesSarajevo Times
Follow US
© 2012 Sarajevo Times. All Rights Reserved.
  • ABOUT US
  • IMPRESSUM
  • NEWSLETTER
  • CONTACT
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?